

Construction Management
[slide-right]• Optimal coordination and communication due to collaborative approach process
• Cooperative relationships minimize delays in schedule
• Cost savings due to early value engineering collaboration with client and owner
• Verifying constructability of project in design stage reduces changes and keeps costs low
• Shortened project durations
• Responsible subcontractor selection[/slide-right]

Design-Build
[slide-left]• Single source responsibility
• Professional teams experienced in specific project requirements / criteria
• Collaboration early in the design phase minimizes cost and risks associated with changes made later on
• Minimizes disputes as to the scope of the work presented in the contract documents
• Continual analysis and monitoring of project budget, schedule and constructability
• Shortened project schedule[/slide-left]









